Quality Management

Quality Management
CNC Machining Quality Control & Inspection

Quality control from engineering review through FAI, in-process inspection, CMM verification, material traceability, and final inspection for CNC prototypes and production parts.

  • FAI, IPQC & FQC inspection controls
  • CMM dimensional verification for critical features
  • Material verification & production traceability
  • Inspection reports based on project requirements
ISO 9001:2015 | ISO 13485:2016 | IATF 16949:2016
CNC Machining Quality Control & Inspection
800+
Global Customers Served
100+
Total Equipments
5+
Production Bases
100+
Engineering & Design Veterans
CNC Quality Control Process

CNC Quality Control Process

Quality control starts before machining and continues through production, final inspection, and documentation. Inspection scope is defined around drawing requirements, critical features, quantity, and application risk.

Before Machining: Review CAD files, drawings, GD&T, material, finish, critical dimensions, and inspection requirements before manufacturing release.

During Machining: FAI and in-process inspection (IPQC) monitor critical dimensions and process variation before issues continue across a production batch.

Final Inspection: Final quality inspection (FQC) verifies required dimensions, surface condition, finishes, and critical features before shipment. CMM or optical inspection is used where required.

Documentation & Traceability: Inspection records, material documentation, and traceability information are maintained according to project requirements for repeat orders and quality records.

CNC Quality Control Capabilities

CNC Quality Control Capabilities

Quality control covers more than final inspection. Mastars integrates drawing and GD&T review, material verification, first article inspection, in-process control, and final inspection into the CNC machining workflow so critical requirements are checked before issues carry into later production stages.

Depending on part requirements, inspection can include CMM measurement, optical measurement, surface and appearance checks, and critical feature verification. Material traceability, inspection records, and customer-specific inspection plans can also be maintained where required, helping engineering and procurement teams verify part quality from initial release through repeat production.

Quality Standards & Inspection Criteria

Quality Standards & Inspection Criteria

Inspection criteria are defined from approved drawings, GD&T, critical dimensions, materials, finishes, and customer-specific requirements. Critical-to-function features may require tighter inspection frequency or CMM verification, while noncritical dimensions can follow the agreed inspection plan.

For production orders, quality control may include FAI, IPQC, FQC, material traceability, and inspection records based on part requirements and application risk.

Engineering & Quality Team

Engineering & Quality Team

Engineering, quality, and production teams align drawing revisions, critical dimensions, material requirements, inspection methods, and acceptance criteria before manufacturing release. When a nonconformance is identified, the issue is reviewed against function, tolerance, and manufacturing risk before corrective action or disposition.

Inspection Equipment

Machining Centers

Machining Centers

Turning Centers

Turning Centers

Inspection Equipment

Inspection Equipment

Why Choose Mastars?

Multi-Process Machining Capability
Milling, turning, routing, and EDM under one roof, so a project can stay with one supplier from prototype to production.
100+ Engineering Professionals
Direct access to experienced engineers for DFM reviews, machining strategy, and cost-effective production planning.
Certified Quality Systems
ISO 9001, ISO 13485, and IATF 16949 certified processes supported by documented inspection procedures.
Prototype to Production Scalability
From one-off prototypes to ongoing production programs, flexible capacity supports projects at every stage.
DFM Review on Every Order
Manufacturability feedback helps identify machining challenges, reduce cost, and improve part performance before production.
Trusted by Global Engineering Teams
Supporting customers across aerospace, medical devices, robotics, industrial equipment, automotive, and consumer products.

Certifications

ISO9001:2015 Certificate

ISO9001:2015 Certificate

IATF16949:2016 Certificate

IATF16949:2016 Certificate

ISO13485:2016 Certificate

ISO13485:2016 Certificate

Medical A-Class Supplier

Medical A-Class Supplier

Partners

Auer Lighting
Bentley
Aston Martin
NVIDIA
Compac
Auer Lighting
Bentley
Aston Martin
NVIDIA
Compac

How Quality Management Works

Upload Your Design

Share your CAD files, drawings, quantity, material, and any critical requirements.

Get an Engineer-Reviewed Quote

Receive pricing, lead time, and manufacturability feedback based on your part requirements.

Production Begins

Once you approve your quote, manufacturing starts — from prototype tooling to full-scale runs.

Parts Shipped

Finished parts are inspected, packaged, and shipped with the required quality documentation.

What Our Customers Say

Charlie Ozana

Charlie Ozana

Company: 445 LTDJob Title: CEOBusiness: Full turnkey company
The most important thing is not just the good engineers that we have here, or the manufacturing that is good here, is that they work from the heart. They feel that they are part of the project. It's more than business; it's the cooperation between us. This is the one that is the best in masters.
Nathan Johnson

Nathan Johnson

Company: Gusto Global IndustriesJob Title: DirectorBusiness: Dust reduction system
They were such a lovely company to deal with, and we couldn't be more happier even to today down the track with even more products moving forward. Very professional, easy to deal with, get back to you straight away, contact is easy through WeChat and email, move forward as quickly as you can.
Oded Kalawanl

Oded Kalawanl

Company: Annabella Tech IsraelJob Title: R&D managerBusiness: Breast pump
I was the project manager that time of the double press pump along with the great Annabella team and Mastars team. We managed to make it in a very short time warm prototyping to mass production and FDA approval. That makes me feel confidence to choose Mastars.
Jade Harris

Jade Harris

Company: Buddy SystemJob Title: Co-founderBusiness: Wireless instant safety alert device
If there was something we could buy and implement so we could use that but there was nothing in the world quite like what we wanted. So Gary and I went down the path to actually make it ourselves. And we're glad that we found a company like Mastars to make the product for us because it's been so good to deal with. They're a really good company. There's no communication breakdown barrier between English and Chinese speaking. The factory is very clean and they've been really great to deal with and work with.
Dror Harel

Dror Harel

Company: BlonessJob Title: General ManagerBusiness: L300, H200
I think the relationship between the buyers and definitely between me the Mastars it's like a family relationship and this is why we are so happy to produce in Mastars and this is why we came for 15 years. By the way, now we came with a new product that we come to Master to produce for the new year.

CNC Machining Quality Control FAQs

  • How do you ensure quality in CNC machining?

    Quality control starts before machining and continues through production and final inspection. Depending on the project, Mastars uses engineering review, material verification, FAI, IPQC, FQC, CMM measurement, and documented inspection requirements.

  • What inspection methods are available for CNC machined parts?

    CMM, dimensional inspection, optical measurement, visual inspection, height measurement, and surface checks are available based on part requirements. Mastars has 15+ CMM systems with measuring capacity up to 1000 × 700 × 660 mm.

  • Can you provide FAI and inspection reports for CNC machining projects?

    Yes. FAI, dimensional inspection records, and other quality documentation can be provided based on project requirements. Inspection requirements should be defined before production whenever possible.

  • How do you maintain consistency during CNC production runs?

    Stable programs, workholding, process control, IPQC, final inspection, and revision control help maintain consistency across production batches. Critical features can receive additional inspection where required.

  • Do you provide material certifications and traceability for CNC parts?

    Yes, when required by the project. Material specifications, documentation, and traceability requirements should be identified before manufacturing so they can follow the order through production.

  • What CNC machining quality standards and certifications does Mastars follow?

    Mastars operates under ISO 9001:2015, ISO 13485:2016, and IATF 16949:2016 certified quality systems.

  • Can Mastars support CNC parts with tight tolerances and complex geometries?

    Yes. Critical CNC milling features can reach ±0.005 mm on suitable parts. Actual capability depends on geometry, material, workholding, thermal stability, machining strategy, and inspection method.

  • What quality documents can be included with CNC machining orders?

    Depending on project requirements, documentation can include FAI records, dimensional inspection reports, material documentation, traceability records, and other agreed manufacturing records.

  • When does quality control begin in the CNC machining process?

    Before machining. Drawing revision, tolerances, critical dimensions, materials, finishes, and inspection requirements should be reviewed before the manufacturing process is released.

  • Does Mastars support quality requirements for different industries?

    Yes. Inspection depth, documentation, traceability, and acceptance criteria can be adjusted to the part, application, customer specifications, and applicable quality requirements.

Tell Us About Your Project

Share your project details and files with us. Rough information is fine to start. Our engineering consultant will contact you within 24 hours.

Verification code